Commercial roof due diligence and PCA roof reports

What a letter of intent should say about the roof

A letter of intent is where the roof is cheapest to deal with and most often ignored. It does not need a condition opinion. It needs three things: enough time to inspect properly, the right to get on the roof and test it, and the documents that tell you what you are buying.

Rows of rooftop units on a commercial building

A letter of intent cannot tell you anything about the roof, and it is still the most important roof document in the deal. What it decides is whether you will be able to find out: how long you have, whether you can get on the roof and open it up, and what paperwork the seller has to hand over and by when.

Those three items cost a seller nothing while the price is still open. They become expensive to ask for once it is agreed, because by then every request looks like the start of a renegotiation.

The three things to secure

Term What to ask for Why it matters
Inspection period Time measured from document delivery, not from signing Instrumented work and reporting have lead times
Roof access A right of access for the buyer and its consultants, including testing Consent asked for later can be slow or refused
Document delivery A named list with a delivery deadline A missing document becomes a finding, not a dispute

Time measured from document delivery rather than from signing is the single most useful piece of drafting on that table. It stops the clock being eaten by a seller who takes two weeks to send a warranty certificate.

Why the timetable is a roof question

Roof diligence is a sequence, and the slow steps are not the ones buyers plan for.

  1. Walk the roof to an agreed scope and read the result.
  2. Decide whether a moisture survey is justified.
  3. Schedule that survey, which depends on consultant availability and conditions.
  4. Receive the written report, which follows the visit rather than arriving with it.
  5. If anything is unresolved, agree test cuts, get consent and arrange the repair.

A period set long enough for step one and short enough to look attractive to the seller pushes steps three to five outside the window. How the roof work fits across the stages of a deal sets out where each piece belongs, and the practical rule is to work backwards from the report you need rather than forwards from the day you sign.

The documents to name

Ask for these specifically, because a general cooperation clause produces whatever is easiest to find.

  • Roof warranty certificates and the paperwork behind them, including any transfer requirements.
  • The maintenance and repair history, with invoices rather than a summary.
  • Permits for any roof work carried out on the building.
  • Any prior roof report, condition assessment or moisture survey.
  • Rooftop equipment agreements, including solar and telecommunications leases.

The full request, in a form you can send covers the detail. Two of those items routinely change the deal on their own: an unpermitted reroof is a problem the buyer inherits, and a warranty that has been voided by undeclared work is worth nothing however impressive the certificate looks.

What not to put in it

Resist the temptation to take a position on the roof this early. Writing that the roof is accepted in its current condition, or naming a figure for roof work before anybody has been up there, trades away the thing the inspection period is for. The letter should leave the roof open and make it possible to investigate, nothing more.

Equally, do not rely on a seller’s own prior report as a substitute for your own scope. It was commissioned by someone else, to answer someone else’s question, possibly years ago, and you have no standing to rely on it. It is useful background and it is not diligence.

Where to go next

Before signing, read whatever the seller has already disclosed, because that material decides what counts as a new finding later. Then set the inspection period from the report date you need and work through the roof items on a diligence checklist so the scope matches the decision. When findings do arrive, how a roof finding is turned into a price argument is the next step, and the inspection the whole period exists for should be booked the week the letter is signed rather than the week before the deadline.

Common questions

Is a letter of intent the right place to raise the roof at all?

Yes, for process rather than for condition. The letter is where the timetable, the access and the document delivery are agreed, and all three decide what you will be able to find out later. Condition belongs in the inspection period, once somebody has been on the roof.

  • Process terms belong in the letter of intent
  • Condition findings belong in the inspection period
  • Access and time are easiest to win early
  • Document delivery can be made a dated obligation
  • Raising the roof late looks like a renegotiation

The reason to raise it early is leverage rather than information. Before a price is agreed, a request for a longer inspection period or for roof access reads as ordinary diligence. After the price is agreed and the deposit is committed, the same request reads as a buyer looking for a way out, and sellers respond accordingly. Nothing in the letter has to commit you to a view about the roof. It only has to leave you able to form one.

How long an inspection period does a roof actually need?

Long enough to walk it, decide whether instrumented work is needed, schedule that work, and receive a written report. A walkover can happen within days. A moisture survey depends on weather and consultant availability, and a report follows the field work rather than arriving with it.

  • A walkover can be arranged quickly
  • Instrumented work is scheduled, not instant
  • Thermal survey timing depends on conditions
  • Reporting takes time after the field visit
  • Core cuts need consent and a repair plan

Work backwards from the report rather than forwards from signing. If the decision needs a moisture map, the sequence is walkover, decision, scheduling, survey, report, and each link has a lead time that is not yours to control. Buyers who set the period from the walkover alone find the expensive part of the diligence falling outside the window, which leaves a choice between extending, which costs leverage, and deciding without the information, which costs more.

Should the letter of intent name the roof documents we want?

Yes, and with a date attached. A list of documents due within a set number of days of signing turns a vague cooperation clause into something you can measure, and the absence of a document becomes a finding rather than an argument about whether it was ever requested.

  • Name the documents individually, not generically
  • Attach a delivery deadline to the list
  • Include warranty certificates and their paperwork
  • Ask for permit history and invoices, not summaries
  • Silence against a dated list is itself evidence

The list that matters is short: roof warranty documents, the maintenance and repair history with invoices, permits for any roof work, any prior roof or condition report, and details of rooftop equipment agreements. What you learn from a file that arrives incomplete is often more useful than the file itself, because an undocumented roof is a roof nobody has been managing. That is a condition finding arrived at without anybody climbing a ladder.

Can roof findings reopen a price agreed in a letter of intent?

Usually yes, because the letter is normally not binding on price and the inspection period exists precisely so findings can change the deal. What varies is how well that reads. A finding that is new and documented reprices far more easily than one the seller believes was known all along.

  • Most letters of intent leave price open to diligence
  • A documented new finding carries weight
  • Something already disclosed rarely moves a seller
  • The quality of the report decides the argument
  • Timing within the window matters to credibility

That is why the disclosure record matters as much as the inspection. If the seller handed over a report naming wet insulation and the buyer priced the building anyway, raising the same wet insulation later looks like second thoughts rather than discovery. Reading the disclosed material properly before signing the letter protects the ability to reprice on what is genuinely new, and it also tells you which parts of the roof to look at hardest.

Does a non binding letter of intent bind anything about the roof?

Parts of it usually do. Price and the obligation to close are typically non binding, while access, confidentiality, exclusivity and sometimes the document delivery obligation are drafted to bind. Which clauses carry weight is a question for the lawyer drafting it, not an assumption to make.

  • Non binding rarely means the whole document
  • Access and confidentiality often do bind
  • Exclusivity periods are commonly enforceable
  • Document obligations can be drafted either way
  • Ask which clauses survive before signing

For the roof, the clauses worth having on the binding side are access and document delivery, because those are the ones you need to perform before you can decide anything. A letter that grants roof access in binding terms gives a consultant a date to work to. One that mentions cooperation in general terms gives you a conversation to have with a seller's property manager who may have other priorities that week. This is legal drafting, so it belongs with your attorney rather than with a roof consultant.

Book a diligence inspection

Three things and we will call you back. No obligation.

Or call (646) 643-3790